What each of these actually took
A mezzanine over live racking. A self-storage conversion in a building nobody would empty. We detailed 4,800 square feet of deck framing to miss two sprinkler mains, built it in sections that fit through a 12 ft door, and set the whole thing in a four-day shutdown. Plumb on the first check.
A stair that had to match 1911. Four stories of exterior egress stair on a mill building with nothing square in it. Nina field-measured every landing, we built to those numbers instead of the architect's, and it bolted up without a single field cut.
A stainless handrail in a wash-down room. A food plant, a daily caustic wash, and a rail that had to still look new after five years of it. 316L throughout, welds ground back and passivated, bracket feet sealed so nothing wicks under the flange. Polished where hands go and brushed where they do not.
A dock frame at nine at night. A distributor called at 6:40 PM with a leveller frame torn out of the pit. Rig on site by seven, old steel out, new plate welded in, dock loading by six the next morning. That is the whole job; there is nothing clever about it except being there.
Got something like one of these?
Send what you have. A photo and a rough dimension is enough for us to tell you whether it is a shop job or a site job.




